$735,000

4 Bed  •  2 Bath  •  2 Car  •  450m²

Main view of Homely house listing, 13 Urana Rise, Lakelands WA 6180
Floorplan of Homely house listing, 13 Urana Rise, Lakelands WA 6180
Second view of Homely house listing, 13 Urana Rise, Lakelands WA 6180
+32

Sold

13 Urana Rise, Lakelands WA 6180

Copy address

$735,000

  • 4
  • 2
  • 2
  • 450m²

House Sold on Thu 3 Apr, 2025

What's around Urana Rise

House description

“UNDER OFFER WITH FIFI AT EXP - 0451 818 559”

UNDER OFFER WITH FIONA HARVEY AT EXP AUSTRALIA.

Fiona Harvey from EXP AUSTRALIA is proud to present an incredible opportunity to the market. This impressive 2024 BGC-built home effortlessly combines location, lifestyle, and luxury, offering a perfect blend of convenience and class.

From the striking front facade to the immaculate interiors, every detail of this home has been carefully designed. The low-maintenance alfresco area and yard enhance the living experience, providing a seamless flow from inside to outside.

All bedrooms and living spaces are beautifully styled, with elegant flooring and quality paintwork throughout. The home is equipped with high-end appliances, stunning stone benchtops, double basins, and abundant storage space, creating a functional yet stylish living environment.

This energy-efficient, well-appointed home offers numerous standout features including solar panels and so much more:

Master Suite: Featuring a spacious walk-in wardrobe, luxurious double basins in the ensuite, plush carpets, and stunning window furnishings.

Private Theatre Room: Tucked away from the main living areas for ultimate privacy and a peaceful movie experience.

Open-Plan Living Area: A spacious and light-filled dining and lounge room with elegant tile flooring.

Gourmet Kitchen: Stone benchtops, ample storage, gas cooking, a dishwasher, and stainless steel appliances, all overlooking the open-plan living area.

Three Double Bedrooms: Each with built-in robes, plush carpets, stunning window furnishings, and flawless paintwork.

Alfresco Area: Perfect for entertaining, with newly installed lawns ideal for children and pets.

Conveniently located just a short walk from Lakelands Train Station, a 3-minute drive to shops, and 2 minutes to the freeway, this home offers both ease of access and a high-end lifestyle.

The property is now open for inspection-contact Fiona Harvey at EXP AUSTRALIA, your dedicated 5-star agent, to arrange your viewing.

Disclaimer: The information contained in this website has been prepared by eXp Australia Pty Ltd ("the Company") and/or an agent of the Company. The Company has used its best efforts to verify, and ensure the accuracy of, the information contained herein. The Company accepts no responsibility or liability for any errors, inaccuracies, omissions, or mistakes present in this website. Prospective buyers are advised to conduct their own investigations and make the relevant enquiries required to verify the information contained in this website.

Property features

airConditioning

Air Conditioning

builtInRobes

Built-in Robes

livingAreas

Living Areas: 1

study

Study

toilets

Toilets: 2

Council rates

$2000 Yearly

Land details

Area: 450m²

Property video

Can't inspect the property in person? See what's inside in the video tour.

Interactive media & resources

Third view of Homely house listing, 13 Urana Rise, Lakelands WA 6180View more
Fourth view of Homely house listing, 13 Urana Rise, Lakelands WA 6180View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
13 Urana Rise, Lakelands WA 6180
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Lakelands, WA

Top reviews by locals of Lakelands, WA 6180

Discover what it's like to live in Lakelands before you inspect or move.

Discussions in Lakelands, WA

Wondering what the latest hot topics are in Lakelands, Western Australia?

Similar Houses for sale in Lakelands, WA 6180

Properties for sale in nearby suburbs

Report Listing