Price Undisclosed

5 Bed  •  3 Bath  •  5 Car

Magain Real Estate
Main view of Homely house listing, 2 Kauri Parade, Seacliff SA 5049
Second view of Homely house listing, 2 Kauri Parade, Seacliff SA 5049
+19
Floorplan of Homely house listing, 2 Kauri Parade, Seacliff SA 5049

Sold

2 Kauri Parade, Seacliff SA 5049

Copy address

Price Undisclosed

  • 5
  • 3
  • 5

House Sold on Mon 21 Nov, 2022

What's around Kauri Parade

House description

“Lifestyle and opportunity awaits, redevelop or relax, the choice is yours!”

Sitting atop a massive 1146sqm block, this unique 1948 built home boasts a 4 bedroom 2 bathroom home, with self-contained studio/granny-flat with private entry, ideal to rent or Air BnB, making 2 Kauri Parade an impressive 5 Bedroom, 3 Bathroom.

With its impressive 30m frontage, 2 Kauri Parade makes a statement, the sandstone facade sets the theme for the home and you will continue to be impressed as you head inside, with fresh paint and carpets throughout, combined with an abundance of natural light you will fall in love with every aspect of this beachside manor.

Entering the home, in the left wing you have bedrooms 1, 2, 3, the study, and two bathrooms, with the right wing of the home featuring the two living areas, kitchen, laundry, and bedroom 4.

Heading into the right wing, and the first of two living areas, with a fully functioning, stone fireplace and bookshelf large enough for the most avid, life-long reader, both of which help to set the aesthetic theme of the home.

Flowing from here you have the large, formal dining space adjacent to the kitchen. The kitchen is proportionate to the generous size of this property, with ample storage, walk in pantry, dishwasher and more than enough open bench space, there is still room to move, even if the whole family is in the kitchen at once.

Opposite the kitchen is the breakfast bar space that offers yet another area to sit and enjoy the free space in this home.

The second living area is accessed via the dining and kitchen areas and is rich in natural light, perfect for those sunny, winter afternoons.

From the second living area comes the 4th bedroom, offering ample storage in the walkthrough cupboard, away from bedrooms 1, 2 and 3, this room would make the perfect guest room for those staying in the main house, perfect for when the in-laws come to visit your new home!

Heading into the left wing of the home you have the home office, which feeds off the main entryway and hallway to access bedrooms 1, 2 and 3.

Bedroom 1 is generous in size and offers views of the courtyard and garden, and built-in robes.
The proportions continue with an impressively sized bedroom 2 with equally impressive built-in robes. Bedroom 3 is the perfect size for the young adult with once more, generous proportions.
The two gorgeous bathrooms are era appropriate and only add to the unique and individual energy of this home.

Outside of the main house, you have a fully self-contained granny-flat, with a separate driveway and property access, and a private front courtyard.

Heading into the backyard you're sure to stay comfortable year-round with a fire pit and surround seating for the cooler months, an outdoor shower for when you walk home from the beach in warmer months, and enough room to kick the football or play backyard cricket, this property offers space and room to entertain.

2 Kauri Parade is sure to impress, both on paper and in person, based on current zoning (STCC) this property could be divided into two blocks ready to redevelop and build the home (or two!) of your dreams just 4 streets from the beach.

Whether you move in and enjoy or are looking to start fresh, this location has so much to offer, being in the highly sought-after strip west of both Brighton Road and the train line, you have found yourself in one of the most desirable locations in the Adelaide-metro area.

Just steps from the Seacliff Beach, local parks, train line and moments' drive from Marion Shopping centre, Marion Golf Club and the stunning Seacliff Yacht Club and Boardwalk, the move to 2 Kauri Parade will be the move of a lifetime and comes with the beachside lifestyle.

What we know you'll love:
- 5 Bedrooms, 3 bathrooms total
- Self-contained granny-flat/studio - Ideal for short term rental
- 1146sqm land (subdividable STCC)
- 4 streets from one of Adelaide's favourite beaches
- Brighton Secondary zoned
- West of Brighton road
- West of train line
- Close to local favourite restaurants and cafes
- Character features
- 3 meter ceilings in most rooms
- Stone fireplace
- New gas hot water service
- Solar panels
- New carpet

Contact Cain Dover on 0481 759 222 for more information.
(RLA222182)

Property features

livingAreas

Living Areas: 2

toilets

Toilets: 3

Land details

Area: 1146m²
Frontage: 30m²

Property video

Can't inspect the property in person? See what's inside in the video tour.

Interactive media & resources

Third view of Homely house listing, 2 Kauri Parade, Seacliff SA 5049View more
Fourth view of Homely house listing, 2 Kauri Parade, Seacliff SA 5049View more

Contact the real estate agent

Cain Dover
Magain Real Estate

Cain Dover

Magain Real Estate

0Not yet rated
Pete Fallon
Magain Real Estate

Pete Fallon

Magain Real Estate

0Not yet rated

Nearby schools in and around Seacliff, SA

Top reviews by locals of Seacliff, SA 5049

Discover what it's like to live in Seacliff before you inspect or move.

Discussions in Seacliff, SA

Wondering what the latest hot topics are in Seacliff, South Australia?

Similar Houses for sale in Seacliff, SA 5049

Properties for sale in nearby suburbs

Report Listing