$1,140,000

4 Bed  •  2 Bath  •  2 Car  •  779m²

Main view of Homely house listing, 20 Meridian Way, Tweed Heads NSW 2485
Floorplan of Homely house listing, 20 Meridian Way, Tweed Heads NSW 2485
Second view of Homely house listing, 20 Meridian Way, Tweed Heads NSW 2485
+15

Sold

20 Meridian Way, Tweed Heads NSW 2485

Copy address

$1,140,000

  • 4
  • 2
  • 2
  • 779m²

House Sold on Thu 24 Oct, 2019

What's around Meridian Way

House description

“BEAUTIFULLY RENOVATED HOME OFFERING PREMIUM WATER FRONTAGE”

Showcasing premium waterfront living, dream entertaining spaces and a beautifully renovated layout, you will love long lazy afternoons spent enjoying this home. Filled with an abundance of natural light, the floorplan is designed to draw you through to the covered outdoor spaces and perfectly frame that gorgeous view.

The home revolves around the open-plan living, kitchen and dining zone. An on-trend neutral colour palette and walls of stacking glass doors and windows offer a contemporary indoor-outdoor lifestyle.

There's a bar station with a wine fridge nestled under a timber beam feature while the sleek and modern kitchen is truly special. Sweeping benchtops, a corner pantry, stainless steel appliances with 6 burner gas cooktop, and a striking mirrored splashback help create a space that any home chef will adore.

Entertaining will be a dream on the expansive outdoor area that overlooks the grassed yard, canal and your own private boat ramp with built-in electric winch. There's a built-in kitchen with a sink and space for a fridge while a glass balustrade ensures uninterrupted views and is great for those with children.

There are four good-size bedrooms plus two stylish bathrooms, both with floor-to-ceiling tiles.

Extra features include solar hot water, a 1,000-litre water tank, reverse cycle ducted heating and cooling plus an enviable north-east facing aspect. There's a two-car garage, tool shed plus room to store a boat or caravan while you plan your next adventure.

This low-maintenance home is set on along a quiet cul-de-sac and is just moments from shops, schools and iconic Tweed and Gold Coast beaches. A quick 400-metre boat trip will take you to the open water of Terranora Creek, perfect for a day out on the water.

Property features

airConditioning

Air Conditioning

Other features

Water Front

Council rates

$4089.60 Yearly

Building details

Area: 310m²

Land details

Area: 779m²

Interactive media & resources

Third view of Homely house listing, 20 Meridian Way, Tweed Heads NSW 2485View more
Fourth view of Homely house listing, 20 Meridian Way, Tweed Heads NSW 2485View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
20 Meridian Way, Tweed Heads NSW 2485
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Tweed Heads, NSW

Top reviews by locals of Tweed Heads, NSW 2485

Discover what it's like to live in Tweed Heads before you inspect or move.

Discussions in Tweed Heads, NSW

Wondering what the latest hot topics are in Tweed Heads, New South Wales?

Similar Houses for sale in Tweed Heads, NSW 2485

Properties for sale in nearby suburbs

Report Listing