Price Undisclosed

6 Bed  •  3 Bath  •  5 Car  •  5606m²

Main view of Homely house listing, 29 Flooded Gum Place, Black Mountain QLD 4563
Floorplan of Homely house listing, 29 Flooded Gum Place, Black Mountain QLD 4563
Second view of Homely house listing, 29 Flooded Gum Place, Black Mountain QLD 4563
+21

Sold

29 Flooded Gum Place, Black Mountain QLD 4563

Copy address

Price Undisclosed

  • 6
  • 3
  • 5
  • 5606m²

House Sold on Fri 27 Sep, 2024

What's around Flooded Gum Place

House description

“Discover Your Dream Dual-Living Haven at 29 Flooded Gum Place, Black Mountain”

Welcome to a lifestyle of unparalleled luxury and versatility at 29 Flooded Gum Place, Black Mountain. Nestled in one of Queensland's most sought-after locations, this exceptional property offers an incredible dual-living opportunity on a sprawling 5,606 sqm block. With its breath taking views, meticulously manicured gardens, and prime positioning near Cooroy and Noosa, this home is the epitome of refined living.

A Lifestyle Surrounded by Nature:
Immerse yourself in the tranquil surroundings of Black Mountain, where every viewpoint offers lush greenery and breath taking elevated vistas. This home is not just a residence but a retreat from the hustle and bustle, allowing you to enjoy the serenity of nature without sacrificing convenience.

Property Highlights:
• Dual-Living Design: Perfect for extended families or generating rental income, this home features two distinct living areas. The dual living spaces are separated by a breezeway and private courtyard/alfresco area, offering both privacy and connection.
• East Wing - Guest Quarters or Rental Income:
• Two generous bedrooms with built in robes
• Fully equipped kitchenette, bathroom, and powder room
• Spacious living and dining areas
• Covered outdoor entertaining area with shared access to the pool and alfresco spaces
• West Wing - Main Living Area:
• Four bedrooms, including a master suite with a walk-in robe and ensuite
• Versatile fourth bedroom, ideal as a study or guest room
• Large, fully equipped kitchen, lounge, dining, and laundry
• Private outdoor entertaining area with shared pool access
• Resort-Style Amenities:
• Stunning 8.4 x 2.4m pool with panoramic views of the property
• Expansive alfresco areas perfect for entertaining
• Double garage with internal access
• Large 10 x 8m shed, ideal for storing boats, cars, and more
• Eco-Friendly Features:
• Solar power system for sustainable living
• Ducted reverse cycle air conditioning for year-round comfort

Prime Location:
29 Flooded Gum Place is perfectly positioned to enjoy the best of both worlds. You're just a short drive away from the vibrant communities of Cooroy and Noosa, offering easy access to shopping, dining, and entertainment. Enjoy the proximity to some of Queensland's most beautiful beaches, national parks, and cultural attractions.

Additional Income Potential:
Currently, whole or half of the property is successfully operating as an Airbnb, providing an excellent opportunity for side income. This setup allows you to benefit from the booming tourism market in the region while maintaining your private residence.

Experience the Magic of Black Mountain:
Whether you're seeking a family home, an investment property, or a dual-living setup, 29 Flooded Gum Place offers it all. Don't miss the chance to own a piece of paradise in one of Queensland's most desirable locales.

Contact us today to schedule a private inspection and discover the endless possibilities that await you at this extraordinary property.

Property features

ensuites

Ensuites: 1

Building details

Area: 281m²

Land details

Area: 5606m²

Property video

Can't inspect the property in person? See what's inside in the video tour.

Interactive media & resources

Third view of Homely house listing, 29 Flooded Gum Place, Black Mountain QLD 4563View more
Fourth view of Homely house listing, 29 Flooded Gum Place, Black Mountain QLD 4563View more

Contact the real estate agent

Reuben and Tarryn Smit

Eview Group

0Not yet rated
This property has been sold
But you can still contact the agent
29 Flooded Gum Place, Black Mountain QLD 4563
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Black Mountain, QLD

Top reviews by locals of Black Mountain, QLD 4563

Discover what it's like to live in Black Mountain before you inspect or move.

Discussions in Black Mountain, QLD

Wondering what the latest hot topics are in Black Mountain, Queensland?

Similar Houses for sale in Black Mountain, QLD 4563

Properties for sale in nearby suburbs

Report Listing