$850,000

4 Bed  •  3 Bath  •  2 Car  •  269m²

Main view of Homely house listing, 364B Hardey Road, Cloverdale WA 6105
Floorplan of Homely house listing, 364B Hardey Road, Cloverdale WA 6105
Second view of Homely house listing, 364B Hardey Road, Cloverdale WA 6105
+15

Sold

364B Hardey Road, Cloverdale WA 6105

Copy address

$850,000

  • 4
  • 3
  • 2
  • 269m²

House Sold on Tue 14 Oct, 2025

What's around Hardey Road

House description

“Stylish Double-Storey Living in a Convenient Location”

Built in 2007 on a 269sqm strata title block with no strata fees, this modern double-storey residence offers 152sqm of thoughtfully designed living space, perfect for families, professionals, or investors looking for a low-maintenance lifestyle.

The ground floor welcomes you with a spacious open-plan living, dining, and kitchen area fitted with split-system air conditioning for year-round comfort. The kitchen is well appointed with an island bench, gas cooktop, dishwasher, and plenty of storage. A large lounge room provides additional living space, while the convenience of under-stair storage and a shopper's entry from the double garage add to the home's practicality. Also located on this level is a comfortable bedroom complete with a built-in robe and split-system air conditioning, alongside a bathroom with shower and toilet. A private courtyard at the rear creates the perfect spot for outdoor entertaining.

Upstairs, the master suite is a true retreat featuring a walk-in robe, private ensuite, and split-system air conditioning. Bedrooms two and three also include built-in robes and their own split-system air conditioning, serviced by a well-presented third bathroom with both bath and shower, as well as a separate toilet.

Additional highlights include a security alarm system, a double garage with internal access, and the benefit of a strata-titled property without any ongoing strata levies. With its combination of comfort, functionality, and security, this home represents an excellent opportunity for buyers seeking modern, low-maintenance living in a convenient location.

Property Features
• Built in 2007 on a 269sqm strata title block with no strata fees, this double-storey home offers 152sqm of well-designed living space.
• The master bedroom features a walk-in robe, ensuite, and split-system air conditioning, while bedrooms two and three include built-in robes and their own split-system air conditioning.
• A fourth bedroom is located downstairs and comes complete with a built-in robe and split-system air conditioning.
• There are three bathrooms in total, with the master ensuite, an upstairs bathroom with bath and shower plus separate toilet, and a downstairs bathroom with shower and toilet.
• The spacious open-plan kitchen, meals, and living area is fitted with split-system air conditioning and the modern kitchen includes an island bench, gas cooktop, dishwasher, and ample storage.
• A large separate lounge room and convenient under-stair storage add to the functionality of the home.
• The double garage provides internal shopper's entry for added security and convenience.
• Extra features include a security alarm system, a private courtyard for outdoor entertaining, and a low-maintenance lock-and-leave design.

Property features

airConditioning

Air Conditioning

alarmSystem

Alarm System

builtInRobes

Built-in Robes

dishwasher

Dishwasher

fullyFenced

Fully Fenced

remoteGarage

Remote Garage

secureParking

Secure Parking

Building details

Area: 152m²

Land details

Area: 269m²

Interactive media & resources

Third view of Homely house listing, 364B Hardey Road, Cloverdale WA 6105View more
Fourth view of Homely house listing, 364B Hardey Road, Cloverdale WA 6105View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
364B Hardey Road, Cloverdale WA 6105
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Cloverdale, WA

Top reviews by locals of Cloverdale, WA 6105

Discover what it's like to live in Cloverdale before you inspect or move.

Discussions in Cloverdale, WA

Wondering what the latest hot topics are in Cloverdale, Western Australia?

Similar Houses for sale in Cloverdale, WA 6105

Properties for sale in nearby suburbs

Report Listing