$800,000

3 Bed  •  1 Bath  •  5 Car  •  614m²

Main view of Homely house listing, 4 Burunda Road, Rosebud VIC 3939
Floorplan of Homely house listing, 4 Burunda Road, Rosebud VIC 3939
Second view of Homely house listing, 4 Burunda Road, Rosebud VIC 3939
+14

Sold

4 Burunda Road, Rosebud VIC 3939

Copy address

$800,000

  • 3
  • 1
  • 5
  • 614m²

House Sold on Wed 16 Apr, 2025

What's around Burunda Road

House description

“Delightfully peaceful”

This home has been lovingly renovated with low maintenance in mind, allowing you more time to enjoy the beautiful Mornington Peninsula!

The gorgeous bay beaches are accessible within a 5 minute drive. For the experienced surfers, head in the opposite direction to the back beaches to catch some gnarly waves!

For those with a slower pace in mind, take a short drive to one of the many wineries, and enjoy the exquisitely produced and prepared local produce.

Love taking in 18 holes on a gorgeous sunny day? The Bay Views Golf course is a short walk away and has the most spectacular bay views!

How about a day of pampering? The Peninsula Hot Springs and newcomer Alba Thermal Springs and Spa are exceptional!

Feel like a leisurely cruise? The bay and back beaches offer endless vantage points to enjoy the natural beauty the Mornington Peninsula has to offer!

Rosebud plaza is a short drive away, and there are many shopping strips to discover and enjoy.

Become a part of this friendly community, with many groups to join and make new lifelong friends!

And once you have spent a full day enjoying the many sights, sounds, tastes and feels, you can retire to your warm and cosy home, which feels like you are on holidays every day of the year!

Melbourne CBD is just over an hours drive on Peninsula Link and the Monash, or take the ferry across the bay to Queenscliff for a day trip.

Features of this beauty include:
⁃ open plan living area, prewired for 7.1 surround sound
⁃ wired for zone 2 audio in carport
⁃ brand new owner designed kitchen, with soft close cabinetry in warm tones, gun metal grey stainless steel appliances and glass splash back, subway tiles, black natural stone island bench top with waterfall edge, 900mm Westinghouse upright gas cooktop with electric oven and exhaust fan
⁃ The laundry features the same cabinetry, stone bench top, subway tiles as the kitchen, and a stainless steel wash basin
⁃ Three bedrooms with new vinyl floorboards, 2 with full length sliding door wardrobes
⁃ All windows have ivory vertical blinds
⁃ Central family bathroom features a frameless glass shower screen and rain shower head, separate toilet
⁃ Extra large man cave/garage, 7.3m deep x 6m wide, with power, space for 2 vehicles, games room, or plenty of storage, with brand new motorized roller door
⁃ Large uniquely designed carport, for up to 5 vehicles
⁃ Beautiful brand new front fence, with motorized sliding gate, offering style and security
⁃ Front and rear yards are fully fenced, and are tree free, so plenty of room for the kids and pets to enjoy, or a blank canvas to design and execute your landscaping dream yard
⁃ Weather boards replaced and freshly painted with a warm colour palette

Property features

alarmSystem

Alarm System

balcony

Balcony

builtInRobes

Built-in Robes

deck

Deck

fullyFenced

Fully Fenced

livingAreas

Living Areas: 1

secureParking

Secure Parking

toilets

Toilets: 1

Other features

0

Land details

Area: 614m²

Interactive media & resources

Third view of Homely house listing, 4 Burunda Road, Rosebud VIC 3939View more
Fourth view of Homely house listing, 4 Burunda Road, Rosebud VIC 3939View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
4 Burunda Road, Rosebud VIC 3939
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Rosebud, VIC

Top reviews by locals of Rosebud, VIC 3939

Discover what it's like to live in Rosebud before you inspect or move.

Discussions in Rosebud, VIC

Wondering what the latest hot topics are in Rosebud, Victoria?

Similar Houses for sale in Rosebud, VIC 3939

Properties for sale in nearby suburbs

Report Listing