Price Undisclosed

3 Bed  •  1 Bath  •  0 Car  •  465m²

Main view of Homely house listing, 6 Murray Terrace, Port Elliot SA 5212
Floorplan of Homely house listing, 6 Murray Terrace, Port Elliot SA 5212
Second view of Homely house listing, 6 Murray Terrace, Port Elliot SA 5212
+17

Sold

6 Murray Terrace, Port Elliot SA 5212

Copy address

Price Undisclosed

  • 3
  • 1
  • 0
  • 465m²

House Sold on Wed 14 Oct, 2020

What's around Murray Terrace

House description

“HISTORIC PORT ELLIOT - BEACH AND VILLAGE LIFESTYLE RIGHT IN HEART OF TOWN”

This comfortable, red brick bungalow, circa 1920, is located in the highly sought after heart of Port Elliot, an ideal regional town approximately an hour south of Adelaide. Just a 2 minute walk to the beach at iconic Horseshoe Bay as well as amazing cliff top walks and gardens, and 2 minutes to the historic village centre with its pubs, bakery, wine bar, boutique shops and cafes. Set in a quiet street with rear access. Comprising 3 bedrooms with wide verandas and elevated back verandah offering seaviews.

Please call to arrange a viewing.

Features:
R/c air-conditioner
Combustion heater
NBN connected
Beach shower downstairs
Space for 2 cars off rear lane
Land 15.24 x 30.48 metres

The Phone Code for this property is: 90678. Please quote this number when phoning or texting.

Disclaimer:

Whilst every care has been taken to verify the accuracy of the details in this advertisement, For Sale By Owner (forsalebyowner.com.au Pty Ltd) cannot guarantee its correctness. Prospective buyers or tenants need to take such action as is necessary, to satisfy themselves of any pertinent matters.

Building details

Area: 196m²

Land details

Area: 465m²

Interactive media & resources

Third view of Homely house listing, 6 Murray Terrace, Port Elliot SA 5212View more
Fourth view of Homely house listing, 6 Murray Terrace, Port Elliot SA 5212View more

Contact the real estate agent

For Sale By Owner (SA) (RLA251994)

For Sale By Owner SA

0Not yet rated
This property has been sold
But you can still contact the agent
6 Murray Terrace, Port Elliot SA 5212
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Port Elliot, SA

Top reviews by locals of Port Elliot, SA 5212

Discover what it's like to live in Port Elliot before you inspect or move.

Discussions in Port Elliot, SA

Wondering what the latest hot topics are in Port Elliot, South Australia?

Similar Houses for sale in Port Elliot, SA 5212

Properties for sale in nearby suburbs

Report Listing