Price Undisclosed

4 Bed  •  3 Bath  •  2 Car

Main view of Homely house listing, 68 The Boulevard, Ivanhoe VIC 3079
Second view of Homely house listing, 68 The Boulevard, Ivanhoe VIC 3079
+20
Floorplan of Homely house listing, 68 The Boulevard, Ivanhoe VIC 3079

Sold

68 The Boulevard, Ivanhoe VIC 3079

Copy address

Price Undisclosed

  • 4
  • 3
  • 2

House Sold on Tue 7 Oct, 2025

What's around The Boulevard

House description

“Luxurious Landmark Riverside Family Retreat”

SOLD By Miles Real Estate.
Absolute Yarra River bushland frontage at an iconic Melbourne address sets a magnificent scene on an expansive allotment with a tennis court and swimming pool for the stunning designer spaces with breathtaking views that define this substantial modernist residence cascading across multiple light-filled levels, superbly positioned in the prestigious Fairy Hills pocket.

Secluded beyond towering gums and a sweeping driveway, this beautifully renovated residence with its curved brickwork, extensive double-glazing and wrap-around north-facing terraces blends perfectly into its native landscaped surrounds presenting a prestigious family lifestyle opportunity on a 2,019m2 (approx) landholding.

Warm oak flooring and natural finishes set a sophisticated tone for a vast open-planned living and dining domain framed by a wall of north-side glazing and sliding doors overlooking layers of leafy-treed greenery.

Superb stone and porcelain benchtops along with customized oak cabinetry line a premium chef's kitchen equipped with top of the range Miele appliances while integrating a breakfast island and a butler's pantry.

A corner family room with sliding doors offers fabulous flexibility while further on the ground-floor is a powder room and a luxurious main bedroom suite with walk-in robe, full-height built-ins and an indulgent ensuite featuring designer freestanding bath, twin vanity and frameless shower.

The lower level is equally impressive with three sizable bedrooms complemented by a dual-vanity family bathroom, a large laundry and a huge lounge or rumpus room facing north. All rooms link directly to the surrounding alfresco terrace interconnected to other outdoor areas via external staircase.

Bluestone paving leads to a resort-style entertainment sanctuary embraced by nature and alive with birdsong where a swimming pool (heat-pump) with a sundeck and a floodlit mod-grass tennis court by the Yarra flats are served by a concealed bar and change room with bathroom facilities.

Additional features include hydronic heating, ducted reverse-cycle air-conditioning, security alarm, video intercom, heated towel rails, irrigation and internal remote-control garage with a workshop.

Engineered to the highest standards and meticulously renovated, this spectacular family domain of complete serenity and privacy is a once in a generation opening in an exclusive riverside pocket located just footsteps to Ivanhoe Grammar School and Chelsworth Park while only moments to boutique Ivanhoe shopping and restaurants, train station and Heidelberg's hospitals precinct.

Property features

insideSpa

Indoor Spa

tennisCourt

Tennis Court

Other features

In-ground Pool, Sauna, Tennis Court, Inside Spa

Land details

Area: 2019m²

Property video

Can't inspect the property in person? See what's inside in the video tour.

Interactive media & resources

Third view of Homely house listing, 68 The Boulevard, Ivanhoe VIC 3079View more
Fourth view of Homely house listing, 68 The Boulevard, Ivanhoe VIC 3079View more

Contact the real estate agent

Nearby schools in and around Ivanhoe, VIC

Top reviews by locals of Ivanhoe, VIC 3079

Discover what it's like to live in Ivanhoe before you inspect or move.

Discussions in Ivanhoe, VIC

Wondering what the latest hot topics are in Ivanhoe, Victoria?

Similar Houses for sale in Ivanhoe, VIC 3079

Properties for sale in nearby suburbs

Report Listing