$680,000

3 Bed  •  2 Bath  •  2 Car  •  265m²

Main view of Homely townhouse listing, 73 Gledhill Street, Narre Warren South VIC 3805
Floorplan of Homely townhouse listing, 73 Gledhill Street, Narre Warren South VIC 3805
Second view of Homely townhouse listing, 73 Gledhill Street, Narre Warren South VIC 3805
+12

Sold

73 Gledhill Street, Narre Warren South VIC 3805

Copy address

$680,000

  • 3
  • 2
  • 2
  • 265m²

Townhouse Sold on Thu 16 Oct, 2025

What's around Gledhill Street

Townhouse description

“Beautiful family home.”

Welcome to this beautifully crafted home that blends modern aesthetics with family-friendly living.

This single-story house offers three spacious bedrooms and a host of desirable features that make it a perfect fit for families or those seeking a comfortable suburban lifestyle.

The heart of this home is its kitchen, which is perfectly outfitted with an island bench, and high-quality stainless-steel appliances including a cooktop and oven. The entire spacious and light filled living area overlooking the decked and covered pergola, including a secure double garage and a laundry room, is designed for both functionality and aesthetic appeal.

Each bedroom is a private retreat, carpeted for comfort and equipped with ample storage. The main bedroom boasts a walk-in robe and an ensuite with a shower, ensuring a private and serene space. Additional bedrooms are also well-appointed with built-in robes, making them ideal for family or guests.

Outdoor living is equally impressive with a tidy backyard that invites relaxation and family gatherings. The inclusion of a covered and decked pergola enhances outdoor functionality, providing extra space for leisure activities.

Located in a vibrant community, 73 Gledhill is just across a reserve and walking distance to the park and just moments away from top educational institutions such as St Catherine’s Catholic Primary School, Berwick Chase Primary School, Hillsmeade Primary School, and St Francis Xavier College Berwick Campus.

The proximity to Berwick Waters Park, Eden Rise Village Shopping and local bus stops ensures that everything you need is within easy reach, adding to the convenience of this prime location.

Please call us to register for an inspection.

Property features

airConditioning

Air Conditioning

builtInRobes

Built-in Robes

courtyard

Courtyard

deck

Deck

dishwasher

Dishwasher

ductedHeating

Ducted Heating

ensuites

Ensuites: 1

fullyFenced

Fully Fenced

outdoorEnt

Outdoor Entertaining

remoteGarage

Remote Garage

secureParking

Secure Parking

toilets

Toilets: 2

Other features

0

Land details

Area: 265m²

Interactive media & resources

Third view of Homely townhouse listing, 73 Gledhill Street, Narre Warren South VIC 3805View more
Fourth view of Homely townhouse listing, 73 Gledhill Street, Narre Warren South VIC 3805View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
73 Gledhill Street, Narre Warren South VIC 3805
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Narre Warren South, VIC

Top reviews by locals of Narre Warren South, VIC 3805

Discover what it's like to live in Narre Warren South before you inspect or move.

Discussions in Narre Warren South, VIC

Wondering what the latest hot topics are in Narre Warren South, Victoria?

Similar Townhouses for sale in Narre Warren South, VIC 3805

Properties for sale in nearby suburbs

Report Listing