By Appointment Only

6 Bed  •  3 Bath  •  2 Car

Main view of Homely house listing, Address available on request
Second view of Homely house listing, Address available on request
Third view of Homely house listing, Address available on request
+22

Address available on request

Copy address

By Appointment Only

  • 6
  • 3
  • 2

House for sale

What's around Gables

House description

“THE GABLES | 450m² REGISTERED LAND | 6 BEDROOMS | HOME + GRANNY FLAT | PERFECT FOR DUAL LIVING & RENTAL INCOME”

Spacious Family Home with Flexible Living Options in The Gables

Set on a generous 450m² registered block with a wide 14.81m frontage, this stunning turnkey home offers exceptional space, flexibility and lifestyle appeal for growing families, extended families and savvy investors.

Featuring 6 bedrooms, 3.5 bathrooms and a double garage, the thoughtfully designed floorplan provides multiple living options and excellent flexibility for large or extended families.

The generous layout may also provide potential for dual-living arrangements, guest accommodation or additional rental income, subject to final design, council requirements and relevant approvals.

PACKAGE INCLUSIONS

⭐ 450m² Registered Land
⭐ Full Turnkey Package
⭐ 100% Fixed Site Costs
⭐ 25-Year Structural Guarantee by Transpire Construction
⭐ Ready to Build

PREMIUM FULL TURNKEY INCLUSIONS

✔ 7-Star BASIX Compliant
✔ 2,600mm Ground Floor Ceiling Height
✔ 900mm Stainless Steel Technika Kitchen Appliances
✔ Two-Zone Ducted Reverse-Cycle Air Conditioning
✔ Floor Tiles to Living & Alfresco Areas
✔ Carpets to Second Floor
✔ LED Downlights Throughout
✔ Blinds & Flyscreens to All Windows
✔ Concrete Driveway & Porch
✔ Full Front, Side & Rear Fencing
✔ Front, Side & Rear Landscaping
✔ NBN Ready
✔ Clothesline & Letterbox

PRIME THE GABLES LOCATION

📍 Approx. 3-minute walk to Newhaven Avenue Reserve
📍 Approx. 5-minute walk to Bitalli Pond
📍 Approx. 5–10-minute walk to Kingsburgh Parkway Reserve
📍 Approx. 2-minute drive to Oakville Preschool Learning Centre
📍 Approx. 2-minute drive to Bobby Bakehouse Gables
📍 Approx. 3-minute drive to Santa Sophia Catholic School
📍 Approx. 3-minute drive to The Gables Town Centre
📍 Approx. 4-minute drive to Gables Public School – opening in 2027
📍 Approx. 6-minute drive to Box Hill Public & High School
📍 Approx. 8-minute drive to upcoming Box Hill City Centre
📍 Approx. 9-minute drive to Carmel Village Shopping Centre
📍 Approx. 9-minute drive to Vineyard Train Station

A RARE OPPORTUNITY

Combining registered land, a wide 14.81m frontage, six bedrooms and premium full-turnkey inclusions, this is an exceptional opportunity to secure a spacious new home in The Gables, one of Sydney's rapidly growing north-western communities.

Whether you're looking for a spacious family home, accommodation for extended family or a property with flexible living potential, this package offers an excellent combination of space, quality and convenience.

For further information or to arrange a private consultation, please contact:

Fiona | 0411 224 796
Sebastian | 0451 815 758

Disclaimer: All information contained herein is gathered from sources we deem to be reliable. However, we cannot guarantee its accuracy, and interested people should rely on their own enquiries. Images & Furnishing are for illustrative purposes only and do not represent the final product or finishes. Images could be the builder display home or other property developed by the builder. For inclusions refer to the inclusions in the contract of sale. Areas are approximate. All parties are advised to seek full independent legal and professional advice and investigations prior to any action or decision.

Property features

airConditioning

Air Conditioning

alarmSystem

Alarm System

balcony

Balcony

builtInRobes

Built-in Robes

courtyard

Courtyard

dishwasher

Dishwasher

ductedCooling

Ducted Cooling

ductedHeating

Ducted Heating

ensuites

Ensuites: 1

fullyFenced

Fully Fenced

livingAreas

Living Areas: 2

outdoorEnt

Outdoor Entertaining

remoteGarage

Remote Garage

rumpusRoom

Rumpus Room

study

Study

toilets

Toilets: 4

Other features

3 Phase Power, Area Views, Carpeted, Close to Schools, Close to Shops, Close to Transport

Land details

Area: 450m²

Inspection times

Contact the agent
To request an inspection
Fourth view of Homely house listing, Address available on requestView more
Fifth view of Homely house listing, Address available on requestView more

Contact the real estate agent

Nearby schools in and around Gables, NSW

Top reviews by locals of Gables, NSW 2765

Discover what it's like to live in Gables before you inspect or move.

Discussions in Gables, NSW

Wondering what the latest hot topics are in Gables, New South Wales?

Similar Houses for sale in Gables, NSW 2765

Report Listing