$689,900 Full Turnkey Inclusions

3 Bed  •  2 Bath  •  2 Car  •  326m²

Main view of Homely house listing, Lot 34 Vizzini Street, Cranbourne East VIC 3977
Second view of Homely house listing, Lot 34 Vizzini Street, Cranbourne East VIC 3977
Request more photos of Lot 34 Vizzini Street, Cranbourne East VIC 3977

Lot 34 Vizzini Street, Cranbourne East VIC 3977

Copy address

$689,900 Full Turnkey Inclusions

  • 3
  • 2
  • 2
  • 326m²

House for sale

What's around Vizzini Street

House description

“Spacious 3 Bedroom Home Only Moments From The Heart Of Cranbourne”

This three bedroom full turnkey package boasts functionality in the established suburb of Cranbourne. Come home to luxury with a spacious master bedroom, complete with a walk in-robe and private ensuite. Retreat to the open plan living space which features split system heating and cooling making it the perfect place to relax.

Wake up to a life of convenience less than ten minutes from the heart of Cranbourne, with Cranbourne Park Shopping Centre, Cranbourne Station and Casey Grammar School all within an easy stretch. Enjoy summer on the pristine sands of Melbourne’s best bayside beaches, just 15 minutes away. Hop down to the Mornington Peninsula or watch the penguin parade at Phillip Island, both within a leisurely and enjoyable drive. All the amenities of Cranbourne are at your fingertips, including cafés, restaurants and shops. You can be at Cranbourne train station in less than ten minutes, and Cranbourne Park Shopping Centre in just eight minutes.

This fixed priced package includes;

- Fixed Site Costs
- Landscaping to front: Includes a dripper irrigation system with a battery operated timer so no need to worry about time consuming maintenance.
- Rear landscaping: Includes mulched garden beds with trees or plants to rear boundary, turf and topping to remainder of the land to rear and side boundaries with a dripper system connected to the tap.
- Fencing: Full share fencing to sides and rear boundaries as well as a side gate to comply with the developers guidelines.
- Coloured concrete driveway.
- Fold away clothesline with a coloured concrete pad.
- Concrete letterbox to suit house type and meet the design guidelines of the estate.
- Timber Laminate Flooring with Carpet
- Heating and Cooling
- Blinds throughout
- Flyscreens to all windows
- Stainless steel appliances including dishwasher
- Stone benchtops to kitchen
- Tiled shower bases
- Downlights
- Alarm system including sensors and keypad to entry

Property features

airConditioning

Air Conditioning

alarmSystem

Alarm System

builtInRobes

Built-in Robes

dishwasher

Dishwasher

ductedHeating

Ducted Heating

floorboards

Floorboards

fullyFenced

Fully Fenced

remoteGarage

Remote Garage

secureParking

Secure Parking

Other features

0, isANewConstruction

Building details

Area: 16m²

Land details

Area: 326m²

Interactive media & resources

Inspection times

Contact the agent
To request an inspection

Contact the real estate agent

Lot 34 Vizzini Street, Cranbourne East VIC 3977
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Cranbourne East, VIC

Top reviews by locals of Cranbourne East, VIC 3977

Discover what it's like to live in Cranbourne East before you inspect or move.

Discussions in Cranbourne East, VIC

Wondering what the latest hot topics are in Cranbourne East, Victoria?

Similar Houses for sale in Cranbourne East, VIC 3977

Properties for sale in nearby suburbs

Report Listing