Presented with a coastal allure, this captivating 5 bedroom and 2 bathroom brick and tile home beckons with its astute and sort-after location, mere moments from sandy shores.
Upon stepping inside, you're greeted by an oasis of big, bold spaces offering comfort, epitomising coastal living at its finest.
These expansive bedrooms, all but one are equipped with built-in robes, boasting a retreat of tranquillity and relaxation, while ensuring ample storage for all your coastal attire. The heart of the home, the large kitchen, is a chef's delight, boasting an island bench, perfect for culinary creations, complemented by an abundance of cupboard and bench space, ideal for hosting family breakfasts and hearty roast nights.
For casual gatherings and movie nights, the informal living space provides an inviting ambiance, while the adjacent games room sets the stage for spirited pool competitions under the high ceilings and wide walkways that evoke a sense of grandeur and spaciousness throughout.
Adding to the allure is the extra security provided by the locked and gated side access, offering peace of mind for storing a boat or caravan, while the built-in spa beckons for leisurely moments of soaking away worries amidst the easy-care gardens, adorned with tropical frangipanis and hedging, providing both beauty and privacy.
For the hobbyist or handyman, the property features not one, but two workshops - one large and powered offering ample space for tinkering away to your heart's content.
Situated on a corner block, a summer's stroll takes you to the water's edge, where endless coastal shorelines await.
Adding to the convenience is being close to schools, medical facilities and charming cafes, every necessity is within reach, ensuring a lifestyle of ease and enjoyment.
Experience the epitome of coastal living in this idyllic and spacious home where every moment is enclosed with the serenity of seaside living.
Contact Michael or Christine Goodwin on 0417 927 159 or 0404 048 880 today.
This information has been prepared to assist in the marketing of this property. While all care has been taken to ensure the information provided herein is correct, Harcourts Mandurah do not warrant or guarantee the accuracy of the information, or take responsibility for any inaccuracies. Accordingly, all interested parties should make their own enquiries to verify the information.