Price Undisclosed

2 Bed  •  1 Bath  •  1 Car

Main view of Homely unit listing, 4/11 Hermitage Rise, Narre Warren VIC 3805
Second view of Homely unit listing, 4/11 Hermitage Rise, Narre Warren VIC 3805
Third view of Homely unit listing, 4/11 Hermitage Rise, Narre Warren VIC 3805
+8

Sold

4/11 Hermitage Rise, Narre Warren VIC 3805

Copy address

Price Undisclosed

  • 2
  • 1
  • 1

Unit Sold on Fri 21 Feb, 2025

What's around Hermitage Rise

Unit description

“Secure Your Future: Modern, Low-Maintenance Living-Buy Off the Plan and Save Big $”

Ray White is thrilled to present a stunning collection of state-of-the-art, luxurious, and low-maintenance units, each boasting its own private street frontage. Nestled in the heart of Narre Warren's most sought-after and convenient pockets, these properties offer an unparalleled blend of modern low maintenance living. With meticulous craftsmanship and attention to detail, these units are designed to exceed your expectations. Act quickly-opportunities like this won't be available for long!

Embodying the essence of contemporary living, these quality units showcase sophisticated architectural designs and a timeless colour palette throughout. Each unit features two generously sized bedrooms and one to two beautifully finished bathrooms, all crafted with high-quality materials. The expansive open-plan living and dining areas create a perfect space for relaxation and entertainment, seamlessly flowing into the luxurious, modern kitchens. Equipped with stainless steel appliances, titled splashbacks, stone benchtops, induction cooktops, and ample cupboard space, these kitchens are both stylish and functional. Every detail has been thoughtfully designed to offer a truly luxurious living experience for the fortunate residents who call these homes their own.

Construction is due to commence early 2025 and will be completed in mid to late 2025.

Countless features on offer to the lucky residents include:

• Stainless steel appliances, inc oven, induction cooktops and dishwasher.
• 6 Star energy ratings.
• Split System for heating and cooling.
• Floating floorboards to all living areas.
• Quality wool carpet to all bedrooms.
• Square set cornices 2700 mm high ceilings
• NBN ready connection to each dwelling.
• 2000L water tank with automatic pump connected to toilets.
• 7 year builders warranty.

Situated in a tranquil, family-friendly neighbourhood, offering an ideal blend of peace and convenience. Just a short drive away, you'll find the bustling Westfield Fountain Gate Shopping Centre, providing a wide range of retail, dining, and entertainment options. Families will benefit from the close proximity to top-rated schools like Oatlands Primary and Fountain Gate Secondary College, ensuring quality education is always within reach.

For outdoor enthusiasts, the nearby Sweeney Reserve offers a perfect spot for recreational activities, from picnics to sports. Commuters will appreciate the convenience of Narre Warren Train Station and easy access to major roads, including the Monash Freeway and Princes Highway, making travel to Melbourne and surrounding areas a breeze.

But wait! There's more! An abundance of other benefits await you:

• Massive Stamp Duty savings
• $10,000 First Home Owners Grant
• Builder's warranty
• Free Tax Depreciation
• High rental yields

These beautiful properties are guaranteed to not last long, so do yourself a favour and act fast!

Contact Mo Zeitouneh on 0413 055 959 for further information.

PLEASE NOTE:
- Please note that the images provided are artistic impressions and are intended for illustrative purposes only. The final product may feature slight variations in design, materials, and finishes.
- Photo ID required at all open for inspections.
- All information contained therein is gathered from relevant third-party sources. We cannot guarantee or give any warranty about the information provided. Interested parties must rely solely on their own enquiries.

Interactive media & resources

Fourth view of Homely unit listing, 4/11 Hermitage Rise, Narre Warren VIC 3805View more
Fifth view of Homely unit listing, 4/11 Hermitage Rise, Narre Warren VIC 3805View more

Contact the real estate agent

This property has been sold
But you can still contact the agent
4/11 Hermitage Rise, Narre Warren VIC 3805
By submitting your enquiry, you agree to our Privacy Policy.

Nearby schools in and around Narre Warren, VIC

Top reviews by locals of Narre Warren, VIC 3805

Discover what it's like to live in Narre Warren before you inspect or move.

Discussions in Narre Warren, VIC

Wondering what the latest hot topics are in Narre Warren, Victoria?

Similar Units for sale in Narre Warren, VIC 3805

Properties for sale in nearby suburbs

Report Listing